翻訳と辞書 |
Sengkang LRT Line : ウィキペディア英語版 | Sengkang LRT Line
The Sengkang LRT Line is a 10.7 km light rail line which partly opened on 18 January 2003. It is the second LRT system in Singapore and is fully automated. The line uses the Crystal Mover rolling stock supplied by Mitsubishi Heavy Industries. This line connects the residential districts and suburbs of Sengkang to the Sengkang Town Centre, which is also served by the North East Line and the Sengkang Bus Interchange. ==History==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Sengkang LRT Line」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|